Here Is The Texas Department Of Transportation Roadwork Report
Here is the latest Texas Department of Transportation Weekly Roadwork Report for our listening area.
Bowie County
Road Construction Ahead
SH 8 – At Sulphur River, replacing bridges.
FM 559 – Between College Drive and Robison Road, installing sidewalks.
Camp County
None
Cass County
SH 8 – At Sulphur River, replacing bridges.
Harrison County
I-20 – At Potters Creek, conducting preventative maintenance work on bridges.
SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.
US 59 – From Marion County Line to Woodlawn Oaks Road, installing a median barrier.
Marion County
None
Morris County
SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
SH 149 – At SH 315, constructing overpass and widening highway.
US 59 – At SH 149 interchange, concrete pavement replacement. Westside entrance and exit ramps closed. Detours in place.
US 79 – From FM 31 to Louisiana State Line, resurfacing highway.
Titus County
SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
Upshur County
US 271—From Camp County Line to 0.5 mile north of FM 2088, resurfacing highway.
FM 1844—At 0.4 mile east of US 271, repairing culvert. Highway closed due to flood damage.