The Interstate 30 construction highlights the weekly road work report from the Texas Department of Transportation.

Bowie County

Interstate 30 – From FM 989 (King's Highway) to Arkansas State Line, widening highway. Construction work will begin on shoulders with most of the work being conducted at night from 8 pm until 6 am.

State Highway 8 – At Sulphur River, replacing bridges.

State Highway 93 – Between Meadow Lane and Kennedy Lane, installing sidewalks.

 

Cass County

State Highway 8 – At Sulphur River, replacing bridges.

Harrison County

US 59 – From FM 1997 to Marion County Line, repairing and resurfacing highway. Traffic restricted to one lane in each direction.

State Highway 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.

Loop 390 – From US 59 to State Highway 43 North, repairing and resurfacing highway. Road closed to through-traffic, detour route is signed.

FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.

Marion County

US 59 – From 1.5 miles south of FM 2208 to Harrison County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

Morris County

State Highway 49 US 79 – From FM 31 to Mill Creek, seal coating highway. – From Titus County Line to FM 144, repairing and resurfacing highway.

Panola County

State Highway 149 – At SH 315, constructing overpass and widening highway.

US 79 – From State Highway 149 to Rusk County Line, repairing and resurfacing highway.

Titus County

State Highway 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.

CHECK THIS OUT: This Texas Home Boasts Its Own Beach And Zipline

 

More From Power 95.9